Our TOCAK-1 HEPP project, with the total installed capacity of 4.90 MW and 14.900.000 KWH /year power generation capacity, taken into operation in April 2009 .

Our Alakir HEPP project, with the installed capacity of 2.10 MW and 14.060.000 KWH /year power generation capacity, will be taken into operation in August 2009.